Repackaging Instructions

Repackaging the Bezzera BZ10

These instructions will guide you through repackaging the BZ10 for transport

NOTE: The machine will need to be drained before shipping.

1) Coil the power cord and maneuver the steam wand to touch the front panel of the machine.
IMG_3347

2) Assemble your accessory box including the downspout from the drip tray.
IMG_3349

3) Position the accessories box on the drip tray under the group head and cover the machine with the bag.
IMG_3350

4) Position the lower foam inserts as pictured.
IMG_3351

5) Gently lower your machine onto the foam inserts so that the feet lock into place.
IMG_3352


6) Insert the top inserts over the machine as pictured.
IMG_3353