Skip to main content

Repackaging the Bezzera BZ10

Imported from HubSpot KB export -- 2026-08-14

Z
Written by Zac P

NOTE: The machine will need to be drained before shipping.

1) Coil the power cord and maneuver the steam wand to touch the front panel of the machine.

IMG_3347



2) Assemble your accessory box including the downspout from the drip tray.

IMG_3349



3) Position the accessories box on the drip tray under the group head and cover the machine with the bag.

IMG_3350



4) Position the lower foam inserts as pictured.

IMG_3351



5) Gently lower your machine onto the foam inserts so that the feet lock into place.

IMG_3352


6) Insert the top inserts over the machine as pictured.

IMG_3353
Did this answer your question?