Steam & Steam Boiler Maintenance

ECM Synchronika: Steam Boiler Pressure Safety Valve Replacement

Below you will find instructions and a video for installing the updated 2.5bar safety valve in the ECM Synchronika Espresso Machine.

Tools Needed:

  • 2.5mm + 3mm Allen Wrenches
  • 20mm Crescent Wrench OR Adjustable Wrench

1. Remove the panels of the machine.

2. Remove the old safety valve.

3. Teflon tape the new safety valve threads.

4. Install the new safety valve.